Geothermal Pumps


Product    >>    Geothermal Pumps


Vansan Pumps is the first geothermal down hole pump manufacturer in Turkey. Vansan
geothermal pumps are successfully used up to 150º C geothermal fluid temperatures
since 1984. In many district heating systems and green house heating systems..

 

Main problem of down hole Pumps is elongation differences between column pipes and
column shafts during start up, which should be taken care of during construction. In all
wells there is a big water temperature difference between well bottom and well top.
Before the pump is started position of impellers in pump bowls is indicated in (figure 1).
When the pump is started column shaft elongates under the down thrust forces (figure
2). When hot geothermal fluid rises up and reaches the pump after a short time.
Because of area of column pipe per unit mass is much greater than the column shaft,
column pipe elongates more than shaft in a short time results, the pull up of impellers
in bowls (figure 3). After the column shaft heats up and shaft and pipe temperatures are
equal, impeller resumes its original position in bowls (figure 4).

Geothermal Discharge Head Assembly

Discharge head must be rigid enough to carry the weight of the complete pump and
motor and axial thrust. Bottom flange must seal the column pipe to allow pressurization
of column to prevent the boiling of geothermal fluid in the well and should not transmit
the heat from the fluid to the motor. Also carry the axial thrust bearing system and
column pipe stretching systems. Discharge piping should not transmit any torque to the
discharge head.

Inhibitor piping and water level measuring system

There are two small pipes running
alongside the column pipe in the well. One is for inhibitor injection and the other for
dynamic water level measurement. Injection piping must be long enough to prevent
calcification approximately 50 m. lower than phase separation level. Dynamic water
level measurement system is also used for annulus pressurizing. Both piping may be
combined by installing a header system at the well head

Pump Assembly

Pump assembly consists of suction case, intermediate bowls and
impellers and discharge head. Pumps are designed to deliver
the required capacity at the required head. Beyond of this basic requirement
another important requirement is to minimize the life cy
geothermal pump. To achieve this important requirement pump must
be designed and selected to work efficiently over the whole range of
frequency controlled operating conditions.


Order
No
Name Location

Water

Temprature

(ºC)

Q (lt/sn) H (m)

Mounting

depth

(m)

Installation

Date

1 Ünlü Sarılar Bergama 60 27 38 15 1984
2 Oruçoğlu Termal Afyon 60 20 55 33 1991
3 Balpaş A.Ş. Balıkesir 65 60 75 42 1991
4 Çan Belediyesi Çanakkale 45 2 75 32 1991
5 İzulaş İzmir 100 4 42 32 1992
6 Oruçoğlu Termal Afyon 60 20 55 33 1993
7 Bolvadin Belediyesi Afyon 70 15 35 20 1993
8 Manolya Apt. İzmir 130 2 35 59 1994
9 Dokuz Eylül Üniversitesi İzmir 60 4 60 38 1994
10 Vural İnşaat İzmir 112 3 95 64 1995
11 Mürüvvet M. Manav Apt. İzmir 130 2 35 53 1995
12 Manyas Termal Manyas 80 12 65 51 1995
13 Oruçoğlu Termal Afyon 60 20 55 33 1995
14 Ortadoğu Akvaryum Bergama 75 25 50 19 1996
15 Manyas Termal Manyas 80 12 65 51 1996
16 Şişko Restaurant İzmir 60 4 30 33 1997
17 Balçova Jeotermal (N1) İzmir 112 15 90 81 1998
18 Balçova Jeotermal (B4) İzmir 112 20 130 72 1998
19 Balçova Jeotermal (B10) İzmir 114 25 130 72 1998
20 Balçova Jeotermal (B11) İzmir 112 24 140 81 1998
21 Remar Ltd.Şti. Dikili 85 7 70 51 1998
22 Ilgaz Deri Gönen 95 15 80 60 1998
23 Dokuz Eylül Üniversitesi İzmir 90 10 120 117 1999
24 Oruçoğlu Termal Afyon 60 25 80 72 1999
25 Kızılcahamam Bel. Ankara 64 65 40 65 1999
26 Orme Jeotermal Aydın 76 5 85 85 1999
27 Bolvadin Belediyesi Afyon 50 10 50 45 2000
28 Gönen Kaplıcaları Balıkesir 68 40 70 80 2001
29 Balçova Jeotermal İzmir 104 42 120 70 2001
30 Gönen Kaplıcaları Balıkesir 62 30 80 80 2001
31 Gönen Kaplıcaları Balıkesir 76 20 80 80 2001
32 Gönen Kaplıcaları Balıkesir 82 30 70 80 2001
33 Balçova Jeotermal İzmir 128 17 120 100 2001
34 Ilgaz Deri Gönen 60 12 100 75 2001
35 Dokuz Eylül Üniversitesi İzmir 110 8 90 100 2001
36 Gönen Kaplıcaları Balıkesir 68 40 70 80 2002
37 Altınyunus Oteli Çeşme 70 50 18 15 2002
38 Balçova Jeotermal İzmir 129 42 100 90 2002
39 İller Bankası Genel Müd.lüğü Ankara 130 56 150 165 2002
40 Balçova Jeotermal Narlıdere 105 15 110 90 2003
41 Sandıklı Jeotermal A.Ş. Afyon 70 100 75 40 2003
42 Doğan Jeotermal Bergama 67 20 118 80 2003
43 Entur Termal Edremit 60 7 45 20 2003
44 Çeşme Jeotermal İzmir 57 45 60 20 2003
45 Kızılcahamam Belediyesi Ankara 85 35 50 70 2003
46 Doğan Jeotermal Bergama 90 3 12 In-Line 2003
47 Doğan Jeotermal Bergama 60 2 20 In-Line 2003
48 Entur Termal Edremit 60 7 45 20 2004
49 Kuzuluk Kaplıcaları Adapazarı 80 35 73 60 2004
50 Başkent Üniversitesi Ankara 60 35 40 60 2004
51 Çeşme Jeotermal İzmir 60 50 60 60 2004
52 Orme Jeotermal İzmir 80 40 90 80 2004
53 Madanoğlu İzmir 90 24 35 In-Line 2004
54 Madanoğlu İzmir 90 58 95 In-Line 2004
55 Menderes Jeotermal A.Ş. Aydın 90 70 17 In-Line 2005
56 Menderes Jeotermal A.Ş. Aydın 90 63 210 In-Line 2005
57 Agrobay Seracılık Bergama 120 40 45 75 2005
58 Agrobay Seracılık Bergama 120 50 40 75 2005
59 Agrobay Seracılık Bergama 120 100 50 In-Line 2005
60 İzmir Jeotermal A.Ş. İzmir 110 100 135 100 2005
61 Orme Jeotermal İzmir 90 11 30 In-Line 2005
62 Orme Jeotermal İzmir 90 53 40 In-Line 2005
63 Sorgun Kaymakamlığı Yozgat 110 50 220 120 2005
64 Orme Jeotermal İzmir 90 114 61 In-Line 2005
65 Orme Jeotermal İzmir 90 54 52 In-Line 2005
66 Agrobay Seracılık Bergama 120 100 50 --- 2005
67 Vegevital Bergama 100 50 80 80 2006
68 Orme Jeotermal İzmir 120 45 120 100 2006
69 Orme Jeotermal İzmir 120 40 130 130 2006
70 Türkeli Seracılık Bergama 90 40 62 80 2006
71 İzmir Jeotermal A.Ş. İzmir 120 100 120 120 2006
72 Salihli Belediyesi Manisa 100 30 60 90 2006
73 Bircan Fide A.Ş. Antalya 90 40 72 54 2006
74 MMK İnşaat İzmir 100 55 45 In-Line 2007
75 Dikili Belediyesi İzmir 90 70 80 60 2007
76 Termiş Tesisat A.Ş. İzmir 100 68 74 In-Line 2007
77 Termiş Tesisat A.Ş. İzmir 100 80 48 In-Line 2007
78 Orme Jeotermal İzmir 120 125 55 In-Line 2008
79 İzmir Jeotermal A.Ş. İzmir 130 83 120 In-Line 2008
80 Menderes Jeotermal A.Ş. Aydın 120 128 50 In-Line 2009
81 Çakır A.Ş. Bergama 100 80 75 80 2009
82 İzmir Jeotermal A.Ş. İzmir 120 55 100 In-Line 2010